Fujairah Northern Land Reclamation Project Phase 5 Spare Area 5C

Year: 2023 – on going
Client: Fujairah Oil Industry Zone (FOIZ)
Location: Fujairah – UAE
Description: To supply rock material for the (follow-up) reclamation works of the FNLRP Phase 4 – Spare Area 5B site into the new FNLRP Phase 5-Spare Area 5C site.
All quarry run rock material (47,000,000 tons in 0-1000kg and 0-300kg sizes) for reclamation filling purposes up to a final level + 5.0 m CD for Spare Area 5C.
MUC Engineering: Client’s Consultant for Supervision and Management.

Construction of 33 Access Bridges to FOIZ Oil Terminals

Year: 2022 – on going
Client: Fujairah Oil Industry Zone (FOIZ)
Location: Fujairah – UAE
Description: The area north of the Port of Fujairah is a designated zone for accommodating Oil Storage Terminals. This area, further referred to as Fujairah Oil Industrial Zone (FOIZ), is subject to rapid expansion due to the increasing demand for oil storage capacity in recent years. The bunker market is a driving force in the business. FOIZ intends to construct access bridges for each of the terminals to assure uninterrupted access to the FOIZ terminals even during laying and maintenance of oil and service pipes.
MUC Engineering: Client’s Consultant for modeling, detailed design and Project Management and Supervision.

FOIZ Emergency Response Center

Year: 2019 – 2021
Client: Fujairah Oil Industry Zone (FOIZ)
Location: Fujairah – UAE
Description: Fujairah Oil Industry Zone (FOIZ) intends to construct a new Fire Station with firemen training facilities on an allocated plot (Spare Area 1B or 1C) within FOIZ.
The scope of the new Fire Station is to provide first response in case of emergency within the FOIZ boundaries.
MUC Engineering: Client’s Consultant for modeling, detailed design and Project Management and Supervision.

FOIZ Central Control Room Building

Year: 2019 – 2021
Client: Fujairah Oil Industry Zone (FOIZ)
Location: Fujairah – UAE
Description: Fujairah Oil Industry Zone (FOIZ) intends to construct a Central Control Room (FOIZ CCR) building within the FOIZ Emergency Response Center (Spare Area 1B) plot.
The function of the new FOIZ CCR building is to monitor Fujairah Oil Industry Zone with video surveillance.
MUC Engineering: Client’s Consultant for modeling, detailed design and Project Management and Supervision.

Fujairah Northern Land Reclamation Project Phase 4 Spare Area 5B

Year: 2017-2022 (completed)
Client: Fujairah Oil Industry Zone (FOIZ)
Location: Fujairah – UAE
Description: Fujairah Oil Industry Zone is planning to reclaim a strip of land in the sea stretching to the east from existing FNLRP project completed between 2009 and 2011. The total required rock material shall constitute of two parts: (a) Reclamation Material arranged and supplied by the Employer, &, (b) Material for Coastal Protection supplied by the Contractor from May 2018 until June 2021. A minimum land area of 663,883 cu.m., corresponding to 8,000,000 cu.m in volume, shall be reclaimed.
MUC Engineering: Client’s Consultant for modeling, detailed design and Project Management and Supervision.