Northern Pipe Rack 3

Year: 2013-2014
Client: Port of Fujairah
Description: Construction of Pipe Rack structure with a total length of 950m to connect Oil Terminals in Fujairah Oil Industry Zone with the Port of Fujairah.
MUC Engineering: Client’s Consultant for detailed design, tender document preparation and coastal engineering studies.