Fujairah Northern Land Reclamation Project Phase 5 Spare Area 5C

Year: 2023 – on going
Client: Fujairah Oil Industry Zone (FOIZ)
Location: Fujairah – UAE
Description: To supply rock material for the (follow-up) reclamation works of the FNLRP Phase 4 – Spare Area 5B site into the new FNLRP Phase 5-Spare Area 5C site.
All quarry run rock material (47,000,000 tons in 0-1000kg and 0-300kg sizes) for reclamation filling purposes up to a final level + 5.0 m CD for Spare Area 5C.
MUC Engineering: Client’s Consultant for Supervision and Management.

Fujairah Northern Land Reclamation Project Phase 4 Spare Area 5B

Year: 2017-2022 (completed)
Client: Fujairah Oil Industry Zone (FOIZ)
Location: Fujairah – UAE
Description: Fujairah Oil Industry Zone is planning to reclaim a strip of land in the sea stretching to the east from existing FNLRP project completed between 2009 and 2011. The total required rock material shall constitute of two parts: (a) Reclamation Material arranged and supplied by the Employer, &, (b) Material for Coastal Protection supplied by the Contractor from May 2018 until June 2021. A minimum land area of 663,883 cu.m., corresponding to 8,000,000 cu.m in volume, shall be reclaimed.
MUC Engineering: Client’s Consultant for modeling, detailed design and Project Management and Supervision.

Fujairah Northern Land Reclamation Project

Year: 2009-2011 (completed)
Client: Government of Fujairah, Fujairah Municipality
Description: Fujairah Northern Land Reclamation Project Phase 1, Reclamation of 225 hectare of new land including 5.8km of coastal protection. The reclamation fill material was rock, obtained from a nearby quarry. A total of 56 million ton has been produced to create the new land.
MUC Engineering: Client’s Consultant for detailed design, modeling studies Supervision and Project Management.