Fujairah Northern Land Reclamation Project Phase 4 Spare Area 5B

Year: 2017-2022 (completed)
Client: Fujairah Oil Industry Zone (FOIZ)
Location: Fujairah – UAE
Description: Fujairah Oil Industry Zone is planning to reclaim a strip of land in the sea stretching to the east from existing FNLRP project completed between 2009 and 2011. The total required rock material shall constitute of two parts: (a) Reclamation Material arranged and supplied by the Employer, &, (b) Material for Coastal Protection supplied by the Contractor from May 2018 until June 2021. A minimum land area of 663,883 cu.m., corresponding to 8,000,000 cu.m in volume, shall be reclaimed.
MUC Engineering: Client’s Consultant for modeling, detailed design and Project Management and Supervision.

Port of Fujairah – Service Harbour Phase 2 – Marine Works and Buildings

Year: 2013-2014
Client: Port of Fujairah
Location: Fujairah – UAE
Description: Construction of a new quay wall for the extension of Port of Fujairah Oil Terminal 2, Phase 2, Berths 8 and 9. The total length of the quay wall is 890m and has a retaining height of 23.6m. The structure is a combi wall with driven Ø1420mm tubular piles. As anchoring system MV piles were used with a total length of 50m. The structure has been installed using marine equipment.
MUC Engineering: Client’s Consultant for detailed design and Project Management and Supervision.

Civil and Marine Engineering

With a specialized staff of Civil and Marine Engineers, planners and draftsmen, MUC has participated in numerous Civil and Marine projects around the world. The design of quay wall structures, jetties, locks, barriers, bridges and tunnels, the preparation of method statements, the performance of dredging analyses etc. have been part of our activities. Our project teams also provide construction management services such as cost estimates, preparation of contract documents and technical specifications, supervision and construction administration.

For any challenge in the field of Civil and Marine Engineering, MUC can offer the complete package and provide cost effective solutions.

Port of Fujairah Northern Breakwater

Year: 2013-2015
Client: Port of Fujairah / Government of Fujairah
Location: Fujairah – UAE
Description: Port of Fujairah Northern Breakwater Project for enclosing of OT2 harbour basin. The total length of the breakwater is 3km. It extends into deep water to a depth of 26m.
MUC Engineering: Client’s Consultant for modeling, detailed design and Project Management and Supervision.