Port of Fujairah, OT2 Phase 2

Year: 2013-2014
Client: Port of Fujairah
Location: Fujairah – UAE
Description: Construction of a new quay wall for the extension of Port of Fujairah Oil Terminal 2, Phase 2, Berths 8 and 9. The total length of the quay wall is 890m and has a retaining height of 23.6m. The structure is a combi wall with driven Ø1420mm tubular piles. As anchoring system MV piles were used with a total length of 50m. The structure has been installed using marine equipment.
MUC Engineering: Client’s Consultant for detailed design and Project Management and Supervision.

Port of Fujairah Northern Breakwater

Year: 2013-2015
Client: Port of Fujairah / Government of Fujairah
Location: Fujairah – UAE
Description: Port of Fujairah Northern Breakwater Project for enclosing of OT2 harbour basin. The total length of the breakwater is 3km. It extends into deep water to a depth of 26m.
MUC Engineering: Client’s Consultant for modeling, detailed design and Project Management and Supervision.

Masterplan Port of Fujairah Expansion Project

Year: 2007-2008
Location: Fujairah – UAE
Client: Port of Fujairah
Description: The Port of Fujairah desired to expand its capacity in the export of aggregates and the oil bunker trade. MUC has made throughput analyses, developed harbour layouts, executed ship manoeuvring and mooring analysis and investigated feasibility of several solutions for marine structures in the port such as breakwaters and quay walls.

Oil Terminal Expansion of the Port of Fujairah

Year: 2008 – 2009
Location: Fujairah – UAE
Client: Port of Fujairah
Description: Detailed design, guidance of the tender process and supervision over the construction works of Oil Terminal 2 phase 1 for the Port of Fujairah. The terminal comprises a new quay wall with a length of approx 1.7 for handling oil tankers up to 180,000 DWT, dredging of the entrance channel and harbour basin, reclamation and coastal protection works.

Port of Fujairah, OT2 Phase 1

Year: 2008-2010 (completed)
Client: Port of Fujairah
Location: Fujairah – UAE
Description: Realization of a quay wall for Port of Fujairah Oil Terminal 2, Phase 1 Including construction of 1.5km of combi wall with a retaining height of 22.8m, 800m of deep water breakwater and 5 million m3 of dredging and reclamation. After completion the facility is able to receive 4 tankers up to a size of 200,000 DWT or 8 handy size tankers.
MUC Engineering: Client’s Consultant for detailed design, Supervision and Project Management.