Fujairah Airport Tunnel Project (Phase 1 and 2)

Year: 2020 – 2021 (Completed)
Client: Emiri Court
Location: Fujairah – UAE
Description: The airport tunnel is approximately 540 m in length from the north ramp to the south ramp and accommodates dual lanes each way. The Phase 1 and 2 Scope of Works is to carry out civil works for the construction of approximately 500.02 m of tunnel length and includes the north and south portals.
MUC Engineering: Client’s Consultant for modeling, detailed design and Project   Management and Supervision.