Port of Fujairah OT2

Year: 2009-2015
Client: Port of Fujairah
Location: Fujairah – UAE
Description: Construction of a new Marine Oil Terminal as extension of the Port of Fujairah Oil Terminal 1. New Berths 4, 5, 6, 7, 8 and 9 were realized with a total length of wall of 2340m and with a retaining height up to 23.6m. Additionally 5 million m3 dredging has been carried out to bring the basin to -18m depths as well as the construction of 1500m long breakwater.
MUC Engineering: Client’s Consultant for detailed design and Project Management and Supervision.