Engineering building – Port of Fujairah

Year: 2016

Location: Port Of Fujairah, Fujairah, UAE

The existing engineering building at the Port of Fujairah, definitely needed a proper facelift. Normally such building would be demolished to be replaced with a new one. Since renovation contributes to the sustainability concept, re-use of the existing structures and adding square meters  in the form of an additional floor was an ideal solution. Within a tight budget, we have been constructed to scrutinize the existing building and to devise a concept for this.

The existing building consists of two parts; one part is constructed in 1985 and the other part in 1989. The idea is to extend this building with additional square meters and by adding a new floor on top of the existing and old structure, we had the idea to combine all structures into a new building.

PoF Engineering Building - Before
Engineering building in Port of Fujairah before reconstruction

The gray collar which can be seen, melts the structures together into one building. The projecting portion on the corner emphasizes an orientation point, it is manager’s office.

MUC was responsible for the architectural design, structural detailing and tendering.

Port of Fujairah, OT2 Phase 2

Year: 2013-2014
Client: Port of Fujairah
Location: Fujairah – UAE
Description: Construction of a new quay wall for the extension of Port of Fujairah Oil Terminal 2, Phase 2, Berths 8 and 9. The total length of the quay wall is 890m and has a retaining height of 23.6m. The structure is a combi wall with driven Ø1420mm tubular piles. As anchoring system MV piles were used with a total length of 50m. The structure has been installed using marine equipment.
MUC Engineering: Client’s Consultant for detailed design and Project Management and Supervision.

Port of Fujairah Northern Breakwater

Year: 2013-2015
Client: Port of Fujairah / Government of Fujairah
Location: Fujairah – UAE
Description: Port of Fujairah Northern Breakwater Project for enclosing of OT2 harbour basin. The total length of the breakwater is 3km. It extends into deep water to a depth of 26m.
MUC Engineering: Client’s Consultant for modeling, detailed design and Project Management and Supervision.

Masterplan Port of Fujairah Expansion Project

Year: 2007-2008
Location: Fujairah – UAE
Client: Port of Fujairah
Description: The Port of Fujairah desired to expand its capacity in the export of aggregates and the oil bunker trade. MUC has made throughput analyses, developed harbour layouts, executed ship manoeuvring and mooring analysis and investigated feasibility of several solutions for marine structures in the port such as breakwaters and quay walls.