Akron Trade & Transport Extension Building (G+3P+7+Penthouse+Roof)

Year: 2015 – on going
Client: Akron Trade & Transport
Location: Fujairah – UAE
Description: Akron Trade & Transport intends to construct an Extension Building (G+3P+7+Penthouse+Roof)
MUC Engineering: Client’s Consultant for modeling, detailed design,Preparation of NOC documentation and obtainingrequired NOCs and Project Management andSupervision.

Dibba Bulk Handling Terminal – Package 4 (Port Buildings

Year: 2018-on going
Client: Port of Fujairah
Location: Fujairah – UAE
Description: Port of Fujairah (PoF) is planning the development of a 15 MTPA (maximum 19 MTPA) Bulk aggregate handling terminal in Phase 1, at the existing Dibba Port in Dibba, Emirate of Fujairah. The proposed materials to be transported and exported includes Limestone, Gabbro and Clinker. FNCT is bidding for the execution of Package 4 – Buildings (Port) Contract.
MUC Engineering: Contractor’s Consultant for tender support, basis of design, detailed design and Preparation of NOC documentation and obtaining required NOCs.

ECOMAR Terminal Storage Extension Project

Year: 2019-on going
Client: Ecomar Energy Solutions Terminal
Location: Fujairah – UAE
Description: ECOMAR intends to increase the storage capacity of oil products by increasing the number of storage tanks. As the plot currently occupied and completely utilised, they are considering different options for expansion on adjacent available plots.
MUC Engineering has been requested to make a feasible study to asses the potential opportunities and identifying the optimum solution for increasing the oil products storage capacity of ECOMAR Energy Solutions Terminal in Fujairah, UAE.
MUC Engineering: Client’s Consultant for detailed design and Project Management and Supervision.

Fujairah Northern Land Reclamation Project Phase 4 Spare Area 5B

Year: 2017-2022 (completed)
Client: Fujairah Oil Industry Zone (FOIZ)
Location: Fujairah – UAE
Description: Fujairah Oil Industry Zone is planning to reclaim a strip of land in the sea stretching to the east from existing FNLRP project completed between 2009 and 2011. The total required rock material shall constitute of two parts: (a) Reclamation Material arranged and supplied by the Employer, &, (b) Material for Coastal Protection supplied by the Contractor from May 2018 until June 2021. A minimum land area of 663,883 cu.m., corresponding to 8,000,000 cu.m in volume, shall be reclaimed.
MUC Engineering: Client’s Consultant for modeling, detailed design and Project Management and Supervision.

FRA New Workshop, Storehouse, Warehouse and Office buildings

Year: 2016-2018
Client: Fujairah Rock and Aggregates (FUJARAC)
Location: Fujairah – UAE
Description: Fujairah Rock and Aggregate (FUJARAC) operates a quarry near the Port of Fujairah. Following continuous development and growth, FUJARAC required a new storehouse for crusher heavy plant parts, a warehouse and an office building to be constructed
MUC Engineering: Client’s Consultant for modeling, detailed design and Project   Management and Supervision.

Port of Fujairah – Service Harbour Phase 2 – Marine Works and Buildings

Year: 2013-2014
Client: Port of Fujairah
Location: Fujairah – UAE
Description: Construction of a new quay wall for the extension of Port of Fujairah Oil Terminal 2, Phase 2, Berths 8 and 9. The total length of the quay wall is 890m and has a retaining height of 23.6m. The structure is a combi wall with driven Ø1420mm tubular piles. As anchoring system MV piles were used with a total length of 50m. The structure has been installed using marine equipment.
MUC Engineering: Client’s Consultant for detailed design and Project Management and Supervision.

Port of Fujairah – Service Harbour Phase 1

Year: 2016-2018
Client: Port of Fujairah
Location: Fujairah – UAE
Description: Development of a new Service Harbour as extension of Port of Fujairah. MUC Engineering has developed a masterplan for the harbor as well as the design of breakwaters, land reclamation quay walls.
MUC Engineering: Client’s Consultant for detailed design and Project Management and Supervision.

Fujairah Rockwool Factory Line 2 Project

Year: 2016-2017
Client: Fujairah Rockwool Factory (FRF)
Location: Fujairah – UAE
Description: Fujairah Rockwool Factory (FRF) is located at Al Hayl Industrial Area, Fujairah and had developed new Line 2 project. The Line 2 project has new manufacturing units like CO Burner Line 1 & 3, CO Burner Chimneys, Briquette Plant, also shed for new store shed and warehouse.
MUC Engineering: Client’s Consultant for detailed design and Project Management and Supervision.